As part of their future-focused vision, Fluxys is undertaking a complete ๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น ๐˜๐—ฟ๐—ฎ๐—ป๐˜€๐—ณ๐—ผ๐—ฟ๐—บ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ผ๐—ณ ๐—ถ๐˜๐˜€ ๐˜„๐—ผ๐—ฟ๐—ธ๐˜€๐—ฝ๐—ฎ๐—ฐ๐—ฒ๐˜€, with Beddeleem responsible for the ๐—ฒ๐—ป๐˜๐—ถ๐—ฟ๐—ฒ ๐—ณ๐—ถ๐˜-๐—ผ๐˜‚๐˜ of this ambitious project.

Scope of Work โ€“ A Two-Phase Overhaul
As a general contractor, it includes everything from pilot construction to technical installations and final interior fit-out.

Phase 1: Upper Floors

  • 7,700 mยฒ of flooring
  • 2,800 mยฒ of JB Partitions
  • 290 doors
  • Bespoke furniture: kitchen units, sanitary blocks, lockers, and more

Phase 2: Ground Floor

  • Major structural works
  • 2,000 mยฒ of flooring
  • 500 mยฒ of JB Partitions
  • 80 high-performance door systems
  • Rooftop terrace installation